Spot Selection
Time required: 10 min
The Breezer can be installed under a window sill, near the air conditioner or by the side of a window. The remote controller also allows the device to be placed under the ceiling.
Installation
Time required: 40 min
The installation crew drills a hole in the wall using a diamond drilling machine, quickly and cleanly. The hole is then heat- and noise-insulated with a special material, and closed off with a decorative grille from the outside.
Pluggin in
Time required: 10 min
The Breezer is mounted on the wall; the inlet of the device is tightly sealed to the air duct to eliminate drafts. The Breezer is plugged into an ordinary power socket.